Skip to content
Back to Integrations

Procore + Sage 300 CRE

Procore and Sage 300 CRE, connected past the standard sync.

Procore connects to Sage 300 Construction and Real Estate through a sync client installed on your Sage system. It covers commitments, budgets and invoices on the standard path. We handle what sits outside it: the detail it consolidates, the exports it rejects, and the reports that still need both systems.

Written by Roberto Postolovski, Founder & Tech LeadUpdated

Today

How it works now

The sync runs in the background, until something stops it.

For contractors running Sage 300 CRE on-premises or hosted, with Procore on their projects.

  1. 01A commitment is approved in Procore and waits in the ERP Integrations tool for an accounting approver.
  2. 02The export fails because the job is closed in Sage 300 CRE, or a change order number is already taken.
  3. 03Invoice detail arrives in Sage consolidated to one line per commitment, so the line-level breakdown is looked up in Procore.
  4. 04Job cost reports are built by exporting from both systems into Excel.
  5. 05When the sync client on the Sage system stops, nobody notices until the numbers stop matching.

The native connector

Where the standard connector stops

From Procore's own documentation for its Sage 300 CRE connector:

Sources

  • The connection depends on an hh2 sync client installed on your Sage 300 CRE system, and changes to it usually involve your IT team.
  • Data reaches Sage only after an accounting approver accepts it in Procore's ERP Integrations tool.
  • Once a project is synced, commitments must be created in Procore, not in Sage 300 CRE.
  • Multiple invoice lines are consolidated into a single line per commitment.
  • Exports fail for jobs in a Closed status in Sage, and commitment change order IDs must be unique.
  • The commitment sync update requires Sage 300 CRE version 23.2 or later.

The automation

How we replace it

Sage 300 CRE is a closed system, so we start with the access you actually have.

  1. 01

    Assess

    Your version, your hosting and the data routes available to you (read access, supported imports, Procore's API) before anything is promised.

  2. 02

    Map

    Jobs, cost codes, categories and vendors are mapped between both systems and signed off by accounting.

  3. 03

    Prevent

    Common export errors (closed jobs, duplicate change order IDs) are detected before the export is sent, with the fix suggested to the approver.

  4. 04

    Report

    Job cost reporting combines Procore and Sage data without monthly manual exports, including the line detail the connector consolidates.

  5. 05

    Approve

    Anything written to Sage 300 CRE stays behind accounting approval.

  6. 06

    Monitor

    The standard sync is watched. A stopped client or a stuck export is reported the same day.

Typical gaps we close

  • Invoice line detail
  • Closed-job export errors
  • Commitment change order numbering
  • Job cost reporting across both systems
  • Sync health monitoring
  • Data outside the connector's scope

Systems involved

  • Procore
  • Sage 300 CRE
  • hh2 sync client
  • Excel
  • Power BI

What stays with your team

Automation should remove the repetition, not the responsibility.

  • Accounting approval of exports
  • Reopening jobs and other ERP decisions
  • Commitment and change order structure
  • Anything the reports flag as inconsistent

What changes

Measured against your own baseline, not against a benchmark.

  • Export failures are caught before month end, with the reason attached
  • Line-level invoice detail is reachable without searching Procore
  • Job cost reports stop depending on manual exports
  • You know the sync is running instead of assuming it

Questions

Common questions

Do you need access to the Sage 300 CRE API?
Not necessarily. Sage restricts its Sage 300 CRE API to approved partner software vendors. Many integrations can be built on read access to your data, supported import routes and Procore's API instead. We confirm which routes your version and hosting allow before the project starts, not after.
We're hosted, not on-premises. Does that matter?
It changes what access is available, so it matters for the design. Hosting providers differ in what they allow, and we check with yours early.
Can you change how Procore's connector works?
No. The standard connector is Procore's product. We work alongside it, catching errors before they happen, monitoring it and adding what it doesn't cover.
Can you help when the sync breaks?
We can monitor it so you know the same day, and diagnose the common causes. Fixes inside the connector itself go through Procore support.

What’s one repetitive process your team does every day?

Tell us about it. We’ll help you determine whether it can be automated, what it would take, and whether the numbers make sense.